• BTC/USD 82718.56
  • ETH/USD 1786.98
  • XRP/USD 2.048
  • LTC/USD 83.29
  • DASH/USD 21.61
  • ETC/USD 16.16
  • BAT/USD 0.1311
  • ZEC/USD 39.93
  • SC/USD 0.00281
  • BCH/USD 304.22
ZEUS MINING
CRYPTO MINING PRO

Function description of AntSpace HK3 V2 container circuit breaker

Note: This is the water-cooled container parameter of the AVIC 1.3 version. If your product is from other manufacturers or versions, it may differ slightly from this parameter. This parameter is for reference only.

1. Function description of the circuit breaker in the electric control box

Switch components (No.)

Function

MCB17

Main switch of system control power supply and power supply of pumping station

MCB18

The system controls the switch of the power supply. After the switch is powered on, the system has an AC220V power supply.

MCB-DC1

The switch of the DC24V power supply in the system. After the switch is powered on, the sensor in the system can read the signal and upload it to the PLC; the touch screen is also powered on, and the system can be controlled from the touch screen.

MCB-DC2

The switch of the DC12 power supply in the system. After the switch is powered on, the system's face recognition and door sensor are powered on; the door can be opened by scanning the face.

MCB-DC3

The switch of the DC5V power supply in the system. After the switch is powered on, the system's camera and main control module are powered on.

MSS6

The circuit breaker is a short-circuit protection switch at the front end of the inverter, mainly to prevent the inverter from overloading.

MCB-31

The circuit breaker is the excitation coil switch in the electric control box responsible for disconnecting the MCB17. When the single circuit breaker is closed, the emergency stop button on the container door is pressed, the MCB17 is disconnected, and the electric control box is powered off.

2. Function description of the circuit breaker in power distribution cabinet A

Switch components (No.)

Function

MCB-A1

Main switch of power distribution cabinet A

MCB-B1

Surge protector front protection switch

MCB-15

Supply power to the switches in power distribution cabinet A.

MCB-21

Supply power to the energy meter in power distribution cabinet A.

MCB1-1~MCB7-15

Supply power to the computing unit on the side of the container.

MCB-30

The circuit breaker is the excitation coil switch in power distribution cabinet A responsible for disconnecting MCB-A1. When the single circuit breaker is turned on, and the emergency stop button on the power distribution cabinet A door or the container door is pressed, the MCB-A1 is disconnected, and the power distribution cabinet A is powered off.

3. Function description of the circuit breaker in power distribution cabinet B

Switch components (No.)

Function

MCB-A2

Main switch of power distribution cabinet B

MCB-B2

Surge protector front protection switch

MCB-16

Supply power to the switches in power distribution cabinet B.

MCB-22

Supply power to the electric energy meter in power distribution cabinet B.

MCB8-1~MCB14-15

Power the computing unit on the other side of the container.

MCB-32

The circuit breaker is the excitation coil switch responsible for disconnecting MCB-A2 in power distribution cabinet B. When the single-circuit breaker is turned on, the emergency stop button on the power distribution cabinet B door or the container door is pressed. The MCB-A2 is disconnected, and the power distribution cabinet B is powered off.


0
About products purchase, please contact our sales manager:
faye@zeusbtc.com

About miner repair and after-sale issues, please contact the repair manager email:
repair@zeusbtc.com

For business cooperation, please contact:
cooperate@zeusbtc.com

COMPLAINTS & SUGGESTIONS
If you have any dissatisfaction during the transaction or have valuable suggestions for us, please contact us via this email address:
service@zeusbtc.com
Qingming Festival Holiday Notice

Dear Customers,
Hello, April 4, 5 and 6, 2025 (GMT+8) are the traditional Chinese festivals - Qingming Festival. Our company will suspend shipments during these 3 days and resume shipments on April 7 (GMT+8). We are deeply sorry for the inconvenience. Thank you for your understanding and support.
Best wishes,
ZEUS MINING CO., LTD


CLOSE
Attention!

Recently, many companies claiming to be mining companies imitate us and say that they are related to us, or that they are our branch companies, which has caused customers to be deceived. Please be careful not to believe any impostors, please check our correct contact information and beware of being deceived getting scammed, and losing money.
please check our right contact way: Here

CLOSE
Customer Service
facebook sharing button Share
twitter sharing button Tweet
reddit sharing button Share
vk sharing button Share
tumblr sharing button Share
pinterest sharing button Pin
whatsapp sharing button Share
linkedin sharing button Share
arrow_left sharing button
arrow_right sharing button