After the equipment has been running for half a year, it is necessary to check and maintain the wiring terminals and crimping screws on the electrical components of the electric control box inside the pump cabinet to prevent the wiring terminals and crimping screws from loosening, resulting in poor contact and damage to the components, and the unit cannot operate normally, thus affecting the work of the entire container water cooling system.
Note: This is the water-cooled container parameter of AVIC version 1.3. If your product is from other manufacturers or versions, it may differ slightly from this parameter. This parameter is for reference only.
Dear Customers,
Hello everyone, as China is about to usher in the Spring Festival, international logistics will be suspended. Zeus Mining is scheduled to stop shipping on January 18, 2025, and start the Spring Festival holiday from January 21 to February 4, 2025 (GMT+8). Pre-sales and after-sales service will reply to the information on February 5, 2025, and shipping will resume on February 8, 2025. Thank you for your support and trust in 2024. In 2025 and the future, we will bring better products and services to our friends.
Best wishes,
ZEUS MINING CO., LTD