• BTC/USD 83159.13
  • ETH/USD 1803.96
  • XRP/USD 2.066
  • LTC/USD 83.73
  • DASH/USD 21.76
  • ETC/USD 16.25
  • BAT/USD 0.1327
  • ZEC/USD 39.41
  • SC/USD 0.002833
  • BCH/USD 308.42
ZEUS MINING
CRYPTO MINING PRO

What are the preparations for the operation of the AntSpace HK3 V2 container system?

Preparing the tank for rehydration:

1. Prepare the coolant;

2. Connect the external pipeline according to the AntSpace installation manual;

3. Check whether the plugs or ball valves on the automatic exhaust valve on the internal pipeline and external connecting pipeline of the container are all open ;

4. Open the top plug of the water tank to ensure that the water tank is connected to the atmospheric pressure;

5. Start preparing for rehydration.

automatic exhaust valve 

plug 

external automatic exhaust valve 

Four basic operations of rehydration:

1. Preparation: prepare materials and tools, and open all exhaust valves of the system;

2. System rehydration: Use the self-priming pump and the rehydration pump to replenish the system, and the circulating pump is required to be manually exhausted;

3. Water tank rehydration: use the self-priming pump and the rehydration pump to rehydrate the water tank;

4. Regular rehydration: You can use the self-priming pump and the rehydration pump in conjunction with the manual rehydration port on the top of the water tank to rehydrate the water tank.

Preparing for air pressure:

1. Prepare the hose and air pump (selection basis: the internal volume of the system is about 1.5m3/h, and the corresponding air volume air pump is selected according to the time requirement; the maximum output air pressure is required to be above 8bar, and 10bar is the best);

2. Connect the external pipeline according to the AntSpace installation manual;

3. Check whether the plugs on the automatic exhaust valve or the ball valve on the internal pipeline and external connection pipeline of the container are all closed (screw the top nut of the automatic exhaust valve to open/close the automatic exhaust valve) (see Figure 1to Figure 4);

4. Start the system to pump air pressure.

automatic exhaust valve

schematic diagram of automatic exhaust valve status

external automatic exhaust valve

state diagram of ball valve

*Note: This is the water-cooled container parameter of the AVIC 1.3 version. If your product is from another manufacturer or other version, it may differ slightly from this parameter. This parameter is for reference only.

0
About products purchase, please contact our sales manager:
faye@zeusbtc.com

About miner repair and after-sale issues, please contact the repair manager email:
repair@zeusbtc.com

For business cooperation, please contact:
cooperate@zeusbtc.com

COMPLAINTS & SUGGESTIONS
If you have any dissatisfaction during the transaction or have valuable suggestions for us, please contact us via this email address:
service@zeusbtc.com
Qingming Festival Holiday Notice

Dear Customers,
Hello, April 4, 5 and 6, 2025 (GMT+8) are the traditional Chinese festivals - Qingming Festival. Our company will suspend shipments during these 3 days and resume shipments on April 7 (GMT+8). We are deeply sorry for the inconvenience. Thank you for your understanding and support.
Best wishes,
ZEUS MINING CO., LTD


CLOSE
Attention!

Recently, many companies claiming to be mining companies imitate us and say that they are related to us, or that they are our branch companies, which has caused customers to be deceived. Please be careful not to believe any impostors, please check our correct contact information and beware of being deceived getting scammed, and losing money.
please check our right contact way: Here

CLOSE
Customer Service
facebook sharing button Share
twitter sharing button Tweet
reddit sharing button Share
vk sharing button Share
tumblr sharing button Share
pinterest sharing button Pin
whatsapp sharing button Share
linkedin sharing button Share
arrow_left sharing button
arrow_right sharing button