Blockstream and Block (formerly Square) will reportedly build a bitcoin mining facility at a solar- and battery-powered site in Texas that uses Tesla's solar and storage technology. Tesla's 3.8 MW solar PV array and 12 MWh Megapack will power the facility. Blockstream co-founder and CEO Adam Back said at the Bitcoin 2022 conference that the facility would prove that 100% renewable energy can be used for large-scale Bitcoin mining.
Dear Customers,
Hello everyone, as China is about to usher in the Spring Festival, international logistics will be suspended. Zeus Mining is scheduled to stop shipping on January 18, 2025, and start the Spring Festival holiday from January 21 to February 4, 2025 (GMT+8). Pre-sales and after-sales service will reply to the information on February 5, 2025, and shipping will resume on February 8, 2025. Thank you for your support and trust in 2024. In 2025 and the future, we will bring better products and services to our friends.
Best wishes,
ZEUS MINING CO., LTD